JOB DESCRIPTION
Drilled Sign Hole & Formed Sign Hole Base(Foundation) Drill 1 – 60″ Diameter Pier Hole at a Depth of 11′ 6″ (Rock)
Form & Pour 60″ x 11’3″ Sign Hole
Form & Pour 5′ L x 3′ W Sign Base (1′ 3″ Below Grade & 2′ 6″ Above Grade per plans)
Material & Labor to Tie Steel, Form & Pour
Form & Pour 5′ L x 3′ W Sign Base (1′ 3″ Below Grade & 2′ 6″ Above Grade per plans)
Material & Labor to Tie Steel, Form & Pour
Deliver & Set Sign Pole with Crane