San Gabriel Park
Accurate Drilling and Construction work on project at San Gabriel Park for bore underground utilities.
JOB DESCRIPTION
Horizontal Drilling
Bored 1 – 3″ Bore at 70 LF ea=70 LF
Bored 1 – 3″ Bore at 70 LF ea=70 LF
1-Bore Pits 3x2x8
1-Bore Pit 18″x12′ x 30″
Provided and Installed 3″ PVC Conduit and Installed Locate Wire