Georgetown Solar Panel Cantilever Foundation
Accurate Drilling takes over the Georgetown Solar Panel Cantilever Foundation drilling
JOB DESCRIPTION
1.) Drilled 4 – 24″ Diameter Pier Holes at a Depth of 8′
2.) Built & Set Cages & Pour Concrete (4000PSI) and Gravel for 4- 24″ x 8′ Piers
******DRIVEWAY EXTENSION******
3.) Excavated Out 36″ W x 44′ L x 4″ THK
4.) Form, Tied & Installed Steel Grid Consisting of 2 – #3’s & 2 – #4’s 44′ L & 36″ #3’s @ 12 O.C.
5.) Excavated Out 8′ W x 15′ L x 4″ THK
6.) Form, Tied & Installed Steel Grid Consisting of #3’s @ 12 O.C.
7.) Drilled & Installed 34 Dowel Rods & Set with 2 Part Epoxy for Cantilever & Driveway Extension
8.) Concrete Slab-Pour & Finish