Edgewood ISD Veteran’s Stadium

Accurate Drilling helped in the Edgewood Veterans Stadium rebuild.

JOB DESCRIPTION

Drilled 2 -12″ Diameter Pier Holes at a Depth of 25′ Minimum Embedment
Drilled 5 -24″ Diameter Pier Holes at a Depth of 30′ Embedment
Drilled 1 -24″ Diameter Pier Holes at a Depth of 37′ Embedment
Drilled 4 – 28″ Diameter Pier Holes at a Depth of 40′ Minimum Embedment

FREE QUOTE

Do you need help with your next foundation drilling, pier drilling or excavation project? Fill out this form to get in touch.

      OFFICE LINE

      MOBILE LINE

      FAX LINE

      512-614-6970

      OFFICE LINE

      MOBILE LINE

      FAX LINE

      512-614-6970